Horror of Zamrudpur came alive after the cracks appeared in Noida Metro Rail Line. Trial for this Metro is going to be started by August end. Cracks were inspected by the official of DMRC. Now Director E.Sreedharan ordered a detailed inspection of the cracks. Both the Badarpur line and the Noida stretch have the same contractor.
Related Pages :




